In the first half of 2019, our company, in cooperation with the project general contractor, the SAS4REAL s.r.o. company, participated in the construction of a new site for DELTA ARMY, s. r. o.. The project was called: Construction of Warehouse Hall and Handling Area.
Our scope of works included the manufacture, transport and assembly of the hall’s load-bearing steel frame and a side administrative addition. The structure was designed as a frame structure system. Additionally, we installed the complete cladding to make the building’s external walls, of sandwich panels, all windows, doors and sectional gates, and last but not least, all sheetmetal and external metalwork fittings and installations.
The successfully completed project was accepted by the investor for use.
Investor: | DELTA ARMY, s.r.o. |
Year: | 2019 |
Total duration: | 4,5 months |
Built-up area: | 896 m² |