The construction of the warehousing hall for a Canadian company Macco Organiques, s.r.o. located in Bruntál in the Moravian-Silesian region started at the end of 2012 and was completed before the end of the first half of 2013 within just 7 months as a turn-key-project, including all landscaping work.

The total scope of the project with the built-up area of 2130 m², with a non-standard hall height of 17 m and very high moving load for the interior floor of the halls, consisting of three separate warehousing halls, made this project one of the largest reference turn-key-projects of FEMONT OPAVA in 2012.

This project was implemented in cooperation with Kingspan a.s. from  Hradec Králové, which delivered all wall and roof sandwich cladding panels for all three warehousing buildings.

Presently, Macco Organiques, s.r.o. is the world’s leader in the area of production and distribution of mineral salts for infusion and dialysis solutions, medicaments, biotechnology, baby food, nutrition additives, veterinarian preparations, mineralized and bottled water and so FEMONT OPAVA was greatly honored that it was selected as the general contractor for the delivery of the entire project.

Investor: Macco Organiques, s.r.o.
Year: 2012–2013
Total duration: 7 months
Built-up area: 2143 m²