At the end of 2018, our company, as the main contractor of the entire project, began construction of a new production hall located in the town of Zubří, for the client BRANO a.s.

BRANO a.s. is our long-term business partner and we were very happy that they entrusted us with this project as well.

The structure of this new production hall was designed using the lattice system with heavy bridge cranes using our company system VEDE. In this case it is a two-aisle production hall with a total built-up area of ​​1874 m² with a height in the attic of 10 m.

As a part of the main construction of the building our company installed slab foundations for the building and relocated the sewers, produced, delivered and installed the steel skeleton of the hall, including the cladding, supplied all roof and façade windows and doors, all trade and construction workers. We also took care of exterior landscaping, including the front asphalt area and lastly the final sheet metal  and hardware works.

This project has been included in our portfolio of production halls.

The work was successfully completed and handed over to the client.

Investor: BRANO a.s.
Year: 2018-2019
Total duration: 6 months
Built-up area: 1874 m²