On the break of 2017/2018, our company successfully participated in implementing a project called: Paskov Elementary School New Gymnasium Building, where we cooperated with the project general contractor, the STAMONT – POZEMNÍ STAVITELSTVÍ s.r.o company.
Our scope of works included the complete manufacture, transport and assembly of the hall’s steel frame, which, on this occasion, was designed as a latticed structure, the installation of supporting corrugated metal plates for the roof covering, external wall cladding made of sandwich panels, the delivery of sheetmetal products and other metalwork structures and fittings.
The sports hall is designed over the total build-up area of 1212 m2, with dimensions 27.25 x 44.48 and truss clearance of 9.5 m.
Investor: | The town of Paskov |
Year: | 2017-2018 |
Total duration: | 4,5 months |
Built-up area: | 1212 m² |