In the summer of 2016, we participated in Slovakia in realization of a multipurpose sport hall for Krupina town in Banskobystrický region.
The sport hall is proposed in a frame steel structure with an indoor steel tribune for watchers and a connecting corridor, which connects the administrative background of the sport hall and the premises of the local school. The wall and roof cladding of the sport hall is solved by sandwich panels with heat insulation.
We established cooperation with company CUBESPACE s.r.o., which was a general supplier of the construction. A precise and quick treatment of the steel parts and problem-free mounting contributed to the general satisfaction of the investor, i.e. Krupina town, as well as the general supplier CUBESPACE s.r.o.
Investor: | Krupina town |
Year: | 2016 |
Total duration: | 5 months |
Built-up area: | 1080 m² |