The production hall for Ing. Alexander Pivovarník – INGMETAL in Presov in the eastern part of Slovakia was the most remote project of our company in Slovakia in 2012.

The new hall consisting partially of the production section together with a bridge crane with lifting capacity of 25 000 kg supported by lattice columns and partially of the administration two-floor section was our largest project in Slovakia in 2012.

The hall structure with the total built-up area of 735 m² was built in a record-breaking time of two months at the end of 2012 and in the beginning of 2013.

Ing. Alexander Pivovarník – INGMETAL deals with the design and manufacturing of moulds for EPS/EPP parts, design and manufacturing of measuring jigs and shape milling for mechanical engineering. For our company FEMONT OPAVA it was a great pleasure to take part in the construction of that new production facility in the City of Presov.

Investor: Ing. Alexander Pivovarník – INGMETAL
Year: 2012–2013
Total duration: 4 months
Built-up area: 750 m²