As a supplier of the steel structure, we realized a construction of the production hall with the size of 30×21 m in Sedliště village near Frýdek Místek. The steel structure is proposed with a crane way with the lifting capacity of 20 t.
The external cladding consists of the heat-insulated metal sandwich panel with heat insulation from PIR foam, the roofing is made from the metal sandwich panel with heat insulation from PUR foam. A classical addition of the hall is tinsmith elements, windows, gateways, including hemming, and a safety ladder with the hatchway to the roof.
Investor: | F.M.T. Group s.r.o. |
Year: | 2016 |
Total duration: | 3 months |
Built-up area: | 630 m² |