Production and warehousing facilities with administration areas for Haberkorn Ulmer s.r.o. in Mokré Lazce between Opava and Ostrava is the second production and warehousing facility with administration areas built by our company for this manufacturer of mechanical parts.

The new production and warehousing facilities for Haberkorn Ulmer s.r.o. were implemented in the middle of 2012 within a period of three months with the built-up area of the two-floor administration areas of 270 m² and the production and warehousing hall of 1380 m² with the overall dimensions of the entire facility of 30×55 m.

This project was implemented in cooperation with Kingspan a.s. from Hradec Králové that delivered the entire wall and roof sandwich cladding. Because of a low gradient, the roof was made of a roof panel with covering foil.

Investor: Haberkorn Ulmer s.r.o.
Year: 2012
Total duration: 3 months
Built-up area: 1650 m²