The Ostrava based facilities of Auto Hruška s.r.o. for sale and servicing of PEUGEOT vehicles, which is located close to the football field, consists of two separate halls – the showroom in the front and the servicing shop in the back hall.

Both these halls with layout dimensions of 678 m² and 440 m² were built within two and a half months in the second half of 2013 and their structures were connected with the existing showroom building of a circular shape in the middle of the entire facilities. Before building the front showroom hall that also includes two-floor administration areas, the investor had to build supporting breast wall in the front part of the hall protecting the hall against landslide.

This project was implemented in cooperation with Kingspan a.s. from Hradec Králové, which delivered all wall and roof sandwich cladding panels for both new halls of the showroom and the servicing shop. The wall cladding used the PEUGEOT color scheme, i.e., RAL 5011, the roof was made of roof panels with foil because of the low gradient of the roof.

Investor: Auto Hruška s.r.o.
Year: 2012
Total duration: 3 months
Built-up area: 1120 m²