The implementation of the bus station in Náchod represented an atypical steel structure consisting of two parts, i.e., the part for the departure stations and the part for the arrival stations of the buses. The steel structure was implemented with the extensions and carried the glazing over the bus stations.

Investor: Town of Náchod
Year: 2014
Total duration: 2 months
Built-up area: 1236 m²