In the autumn of 2014 we were the general contractor for building of a footbridge across the Moravice river in Branka u Opavy. The project consisted in dismantling the old footbridge, and then fabrication and installation of the new footbridge. This was an atypical structure with the dimensions of 52×2 m.
Investor: | The village of Branka u Opavy |
Year: | 2014 |
Total duration: | 2 months |
Built-up area: | 104 m² |