Sedláček s.r.o.
The construction of the cleaning equipment shop for Sedláček s.r.o., was implemented in 2010 in Kolín. The construction of the shop took just one month.
The construction of the cleaning equipment shop for Sedláček s.r.o., was implemented in 2010 in Kolín. The construction of the shop took just one month.
Construction of the shop for NOVUS BIKE s.r.o. The building has a very simple shape with the maximum layout and functional utilization of the space.
A steel structure of the storehouse determined for agricultural purposes, such as storage of feedstuff and bedding for Tvrdkovská zemědělská farma, spol. s r.o.
In 2015, we built a multi-purpose hall for the agricultural cooperative Hraničář in Loděnice. Our company was the general contractor for this project.
The design of the hayloft is based on a frame-type steel structure. The roof of the hayloft is made of trapezoidal sheets and we used wooden jacketing for the external walls.
The animal fodder warehousing facility with 1650 m² for the Vlčeves FARM in the Tábor district was implemented in 2012 within less than two months.
Agricultural warehousing hall for Agrozdroj s.r.o. was implemented in Slovakia in Šaštín in the local area of Stráže.
Construction of the steel structure for the technology, as well as production and mounting of dispatch reservoirs with equipment for MLÝN HERBER spol. s r.o.
For investor Dalkia Česká republika, a.s. we realized steel hall construction for containers with PUR sandwich panels, tinsmith elements and steel staircase.
Construction of steel structure of the hall used by the investor Dalkia Česká republika, a.s. for technological purposes was realized in Ostrava Třebovice.