The construction of the cleaning equipment shop for Sedláček, which is a company established in 1994 and which is focusing on achieving cleanliness and hygiene in all areas of human activities, was implemented in 2010 in Kolín. The construction of the shop took just one month.

This is a heat insulated single-floor hall with single-sloping roof. Wall cladding is in the horizontal direction made of panels with PUR insulation and the roof is made of sandwich panels with the top layer consisting of PVC foil. The basic layout dimensions are 15 m × 24 m. Tinsmith edging components are made of high-quality galvanized sheet with a thickness of 0,7 mm.

The scope of our project included the delivery and subsequent installation of all plastic windows, aluminum facade walls and aluminum doors.

Investor: Sedláček s.r.o.
Year: 2010
Total duration: 2 months
Built-up area: 355 m²