Our company was a general contractor for the construction of new production facilities for the investor Ardagh Metal Packaging Czech Republic s.r.o. in Skřivany. The construction of the building included complete realization of the production double-aisle hall with internal installation, foundation of the lower structure and floor, craftwork, and landscaping. The steel support framing of the hall is designed in the VEDE construction system as a double-aisle hall with truss internal structure with a total built-up area of 3,598 m2.

Investor: Ardagh Metal Packaging Czech Republic s.r.o.
Year: 2016/2017
Total duration: 8 months
Built-up area: 3598 m²