We involved in a construction of the prefabricated steel hall with an administrative part for company Truss Aluminium Factory a.s. The TAF hall with the size of 18×33 m was realized in Olomouc-Hodolany.
It was a frame steel structure with a bridge crane with the lifting capacity of 3,2 t. The heat-insulated hall consists of metal sandwich panels, holes fillers (windows, doors, industrial sectional gateways), an arc-type polycarbonate roof skylight and tinsmith elements of the hall hemming.
Investor: | Truss Aluminium Factory a.s. |
Year: | 2016 |
Total duration: | 5 months |
Built-up area: | 294 m² |