Our company has performed the construction of the shelter for the buses’ parking area in Hradec Králové. The construction was divided into two phases.
The 1st phase has been implementing during 2 months (from December 2014 till January 2015), the built-up area of the 1st part was 3300 m².

The construction of the 2nd part took 3 months (from April to June 2015) with the built-up area of 4230 m². The shelter consists of the lattice steel structure with the roof from trapezoidal sheet metal. The illumination was solved by means of the arc skylights.

Investor:Municipality of Hradec Králové
Year:2014/2015
Total duration:5 months
Built-up area:7530 m²