As the general contractor we implemented construction of a production hall for MEGA D.U. s.r.o. in Uhřice u Brna. The bottom part of the construction included excavation work, concreting, formwork, sub-base work, sewer and water connecting pipes.

The hall has been made as a lattice structure from the VEDE system. The project also included installation of the components necessary for proper function of the hall consisting in roof cladding with PUR panels, and wall cladding with steel panels with mineral insulation. Lighting is ensured by roof skylights.

The project also included installation of doors, windows, sectional industrial gates, fabrication and installation of locksmith structures and metalwork. The project also included paving of exterior staircase and drive ways to the hall. The production hall includes an internal structure.

Investor:MEGA D.U. s.r.o.
Year:2015
Total duration:5 months
Built-up area:947 m²