The additional building of the production premises consists of two parts, namely the machining hall with the size of 23×98 m and the high of almost 8 m and the laboratory with the storage part with the size of 5,6×19 m and the high of 4 m.

The roof cladding consists of a heat-insulated metal sandwich panel with a PUR core, the wall cladding consists of a heat-insulated metal sandwich panel with a mineral core. Tinsmith elements and a safety ladder are a necessary addition of the hall.

Investor:Maxion Wheels Czech s.r.o.
Year:2015/2016
Total duration:5 months
Built-up area:2360 m²