We realized an additional building of the mounting hall as the general supplier. The hall was connected to the existing hall of the investor. The steel structure of the hall is proposed with the use of the VEDE structural system. The roof cladding consists of metal sandwich panels from PVC foil. The external wall is from a metal sandwich PUR panel and partially from a mineral panel.

The separating wall between the halls is solved by the sandwich mineral panel. Two two-storeyed built-in parts with offices were created inside the hall. The roof of the hall is completed by an arc-type skylight, which is glassed-in by transparent polycarbonate and equipped with single-wing shutters for daily interior ventilation.

Investor:HABERKORN Ulmer spol. s r.o.
Year:2016
Total duration:6 months
Built-up area:2163 m²